To guide our customers' projects from inception through permitting,
construction, on going maintenance, remediation and site closure,
we can handle all project requirements starting with, site
assessment. Atlas Environmental will prepare detailed work
plans, will conduct soil gas surveys, and preliminary investigations
consisting of drilling and logging borings, collecting, preparing
and analyzing water and soil samples, installation of monitoring
and extraction wells, preparation of a detailed report of
results. Based on the preliminary findings, the site closure,
risk based corrective action, or complete site assessment
will be pursued.
If remedial actions are requested, Atlas Environmental will
provide the client with a Remedial or Corrective Action Plan
ready for submittal to the agencies. The plan will be based
on site conditions and will include the proposed remedial
actions, treatment process description and implementation
schedule.
|